Video guides make installation easy

At Leading Edge Turbines we've been working hard to help customers install our equipment with ease. On our YouTube channel at www.youtube.com/c/leadingedgeturbines you can watch video tutorials (with captions for customers with English as a second language) on:

Keep an eye on our YouTube channel for further video tutorials and as always we're interested to get your feedback and what else you'd find useful.

1. Setting up the DL-300 charge controller used by our LE-v150 and LE-300 wind turbines - watch it now!

youtube_dl300

2. Wiring up a Leading Edge Turbine wind system that uses a Tristar and dump load: Part 1
In Part 1 we connect up the battery bank and look inside the Tristar charge controller - watch it now!

youtube_wiringpart1

3. Configuring the Tristar 45A/60A charge controller for diversion mode - watch it now!

youtube_tristar

4. Wiring up a Leading Edge Turbine wind system that uses a Tristar and dump load: Part 2
Having configured the Tristar charge controller for Diversion mode we connect the Tristar to the batteries the dump load to the Tristar and finally the wind turbine to the battery bank. Your system is now set-up - watch it now!

youtube_wiringpart2



Tell us about your project

Our Off-grid experts will come back with recommendations

Please leave your details and our experienced team will be in touch soon to assist you.
Please complete all required fields.
x
Can we help?
Leading Edge
Off-Grid Power Requirements
Please complete this form with your specific requirements and we would be happy to put together a bespoke off-grid power system. We will recommend a solution using our own British made wind turbines, best-in-class solar panels and deep-cycle batteries.

Contact Information

Once we have assessed your requirements, our experts will call you to discuss the equipment you'll need to achieve your goals.

What Is The Application?

Please tell us as much as you can about your use case. We understand that you may not be able to answer all questions. We will call you to discuss your requirements in any case.

Device Name
Voltage
Power Draw (W)
Peak Power Draw on Startup (W)
Standby Power (W)
Hours Active Per Day (W)
Days Per Week In Use (W)

Voltage Preference

Do you have a preference for the system voltage?

Outputs Required

Do you have a preference for the systems output?

Site Location

Please tell us a little bit about the site location

Other Details

No. of days autonomy required

Is there anything else we should know?

Leading Edge
Sign Up To Receive Our Newsletter

Stay up to date with Leading Edge innovations and offers by joining our mailing list. Occassionally we send informative newsletters, offers and promotions that we think you'll find useful or interesting.

Your Details

Please provide your contact details so that you can receive our newsletter. We will send this occassionally with information about our latest innovations and offers.