Tristar MPPT (maximum power point tracking) Solar Charge Controller from Morningstar.

 

 
TS-MPPT-45
TS-MPPT-60
Maximum Battery Current 45 amps 60 amps
45A
60A
Maximum Solar Input @ 12V
600W
800W
Maximum Solar Input @ 24V
1200W
1600W
Maximum Solar Input @ 48V
2400W
3200W
Peak Efficiency
99%
Nominal System Voltage
12, 24, 36, 48V DC
Max. Solar Open Circuit Voltage
150V DC
Battery Operating Voltage Range
8-72V DC
Maximum Self-consumption
2.7W
Transient Surge Protection
4500W/port
Temperature Compensation Coefficient  
–5mV/°C/cell (25° ref)
Temperature Compensation Range  
–30°C to +80°C
Dimensions 
29.1 x 13.0 x 14.2 cm
Weight
4.2kg
Max. Wire Size  
35 mm² / 2 AWG
Conduit knockouts 
M20; ½, 1, 1 ¼ inch
Enclosure 
Type 1 (indoor and vented) IP20
Ambient Temperature 
–40°C to +45°C
Storage Temperature 
–55°C to +100°C
Humidity 
100% non-condensing
MeterBus
Yes
Yes
RS-232
Yes
Yes
EIA-485
No
Yes
Ethernet
No
Yes
CE Compliant
ETL Listed (UL1741)
cETL (CSA C22.2 No. 107.1-01)
FCC Class B Part 15 Compliant
Complies with (NEC) U.S. National Electric Code
RoHS Compliant
Manufactured in a certified ISO 9001 facility
Your item has been added to your basket

Tristar MPPT (maximum power point tracking) Controller 45A / 60A

£609.98

£508.15 ex. VAT

Tell us about your project

Our Off-grid experts will come back with recommendations

Please leave your details and our experienced team will be in touch soon to assist you.
Please complete all required fields.
x
Can we help?
Leading Edge
Off-Grid Power Requirements
Please complete this form with your specific requirements and we would be happy to put together a bespoke off-grid power system. We will recommend a solution using our own British made wind turbines, best-in-class solar panels and deep-cycle batteries.

Contact Information

Once we have assessed your requirements, our experts will call you to discuss the equipment you'll need to achieve your goals.

What Is The Application?

Please tell us as much as you can about your use case. We understand that you may not be able to answer all questions. We will call you to discuss your requirements in any case.

Device Name
Voltage
Power Draw (W)
Peak Power Draw on Startup (W)
Standby Power (W)
Hours Active Per Day (W)
Days Per Week In Use (W)

Voltage Preference

Do you have a preference for the system voltage?

Outputs Required

Do you have a preference for the systems output?

Site Location

Please tell us a little bit about the site location

Other Details

No. of days autonomy required

Is there anything else we should know?

Leading Edge
Sign Up To Receive Our Newsletter

Stay up to date with Leading Edge innovations and offers by joining our mailing list. Occassionally we send informative newsletters, offers and promotions that we think you'll find useful or interesting.

Your Details

Please provide your contact details so that you can receive our newsletter. We will send this occassionally with information about our latest innovations and offers.