Perfect for use in hybrid system comprising solar and wind, this LE-300 Wind Turbine Advanced Kit contains everything you need (except batteries & cables) to create a flexible renewable energy system.  Based on our most popular wind turbine, the LE-300 from Leading Edge, it also includes the Tristar 45A diversion charge controller, 300W dump load and a stop/start switch to be used when you want to stop the turbine for maintenance (not to be used in high winds).

The wind turbine is connected directly to the batteries and the Tristar charge controller is also connected to the batteries. When the batteries are fully charged, the controller diverts excess power generated by the wind turbine into the 300W dump load, dissipating the power as heat. A dedicated solar charge controller should be used as the solar and wind systems are parallel systems, both connected to the batteries.

Mount the turbine on a standard scaffold pole (48-50mm outer diameter).  We recommend the Guyed Tower Kit, everything you need (guy wires, earth anchors, foundation plate etc) except for the pole which you source locally.

Your item has been added to your basket

LE-300 Wind Turbine Advanced Kit 12/24/48V

£1484.04

£1236.70 ex. VAT

Tell us about your project

Our Off-grid experts will come back with recommendations

Please leave your details and our experienced team will be in touch soon to assist you.
Please complete all required fields.
x
Can we help?
Leading Edge
Off-Grid Power Requirements
Please complete this form with your specific requirements and we would be happy to put together a bespoke off-grid power system. We will recommend a solution using our own British made wind turbines, best-in-class solar panels and deep-cycle batteries.

Contact Information

Once we have assessed your requirements, our experts will call you to discuss the equipment you'll need to achieve your goals.

What Is The Application?

Please tell us as much as you can about your use case. We understand that you may not be able to answer all questions. We will call you to discuss your requirements in any case.

Device Name
Voltage
Power Draw (W)
Peak Power Draw on Startup (W)
Standby Power (W)
Hours Active Per Day (W)
Days Per Week In Use (W)

Voltage Preference

Do you have a preference for the system voltage?

Outputs Required

Do you have a preference for the systems output?

Site Location

Please tell us a little bit about the site location

Other Details

No. of days autonomy required

Is there anything else we should know?

Leading Edge
Sign Up To Receive Our Newsletter

Stay up to date with Leading Edge innovations and offers by joining our mailing list. Occassionally we send informative newsletters, offers and promotions that we think you'll find useful or interesting.

Your Details

Please provide your contact details so that you can receive our newsletter. We will send this occassionally with information about our latest innovations and offers.