The Leading Edge LE-v150 Extreme is a rugged, silent and highly reliable vertical axis wind turbine designed to provide power outputs of up to 200 watts for a host of different battery charging applications. The LE-v150 Extreme Advanced Kit includes the Tristar 45A diversion charge controller and 300W dump load.

The wind turbine is connected directly to the batteries and the Tristar charge controller is also connected to the batteries. When the batteries are fully charged, the controller diverts excess power generated by the wind turbine into the 300W dump load, dissipating the power as heat. A dedicated solar charge controller should be used as the solar and wind systems are parallel systems, both connected to the batteries.

Included are 7 x 70mm U-bolts (BZP) for side mounting to 50mm or 60mm OD pole. 

Your item has been added to your basket

LE-v150 Extreme Vertical Axis Wind Turbine Advanced Kit

£2077.69

£1731.41 ex. VAT

Tell us about your project

Our Off-grid experts will come back with recommendations

Please leave your details and our experienced team will be in touch soon to assist you.
Please complete all required fields.
x
Can we help?
Leading Edge
Off-Grid Power Requirements
Please complete this form with your specific requirements and we would be happy to put together a bespoke off-grid power system. We will recommend a solution using our own British made wind turbines, best-in-class solar panels and deep-cycle batteries.

Contact Information

Once we have assessed your requirements, our experts will call you to discuss the equipment you'll need to achieve your goals.

What Is The Application?

Please tell us as much as you can about your use case. We understand that you may not be able to answer all questions. We will call you to discuss your requirements in any case.

Device Name
Voltage
Power Draw (W)
Peak Power Draw on Startup (W)
Standby Power (W)
Hours Active Per Day (W)
Days Per Week In Use (W)

Voltage Preference

Do you have a preference for the system voltage?

Outputs Required

Do you have a preference for the systems output?

Site Location

Please tell us a little bit about the site location

Other Details

No. of days autonomy required

Is there anything else we should know?

Leading Edge
Sign Up To Receive Our Newsletter

Stay up to date with Leading Edge innovations and offers by joining our mailing list. Occassionally we send informative newsletters, offers and promotions that we think you'll find useful or interesting.

Your Details

Please provide your contact details so that you can receive our newsletter. We will send this occassionally with information about our latest innovations and offers.