Designed for use with our LE-300 and LE-600 wind turbines, the Guyed Tower Kit includes all the equipment that you need to construct guyed mast up to 7.5m – using a standard scaffold pole (48.3mm or 50mm outer diameter). This makes our guyed tower kit a cost effective solution that simply requires a standard scaffold pole that can be sourced locally.

The guyed tower kit can be installed and raised quickly and easily without need for special winches or equipment. The kit is specially designed so that no concrete foundations are required. Our innovative earth anchors can be driven directly into the ground in most soil conditions. All of the guy ropes are supplied crimped and terminated at one end and with all of the rigging screws and wire grips needed to adjust the guy ropes to the correct length.

Guyed Tower Kit  for an LE-300 includes (quantity for LE-600 in brackets):

Your item has been added to your basket

Guyed Wind Turbine Tower Kit (up to 7.5m)

£607.55

£506.29 ex. VAT

Tell us about your project

Our Off-grid experts will come back with recommendations

Please leave your details and our experienced team will be in touch soon to assist you.
Please complete all required fields.
x
Can we help?
Leading Edge
Off-Grid Power Requirements
Please complete this form with your specific requirements and we would be happy to put together a bespoke off-grid power system. We will recommend a solution using our own British made wind turbines, best-in-class solar panels and deep-cycle batteries.

Contact Information

Once we have assessed your requirements, our experts will call you to discuss the equipment you'll need to achieve your goals.

What Is The Application?

Please tell us as much as you can about your use case. We understand that you may not be able to answer all questions. We will call you to discuss your requirements in any case.

Device Name
Voltage
Power Draw (W)
Peak Power Draw on Startup (W)
Standby Power (W)
Hours Active Per Day (W)
Days Per Week In Use (W)

Voltage Preference

Do you have a preference for the system voltage?

Outputs Required

Do you have a preference for the systems output?

Site Location

Please tell us a little bit about the site location

Other Details

No. of days autonomy required

Is there anything else we should know?

Leading Edge
Sign Up To Receive Our Newsletter

Stay up to date with Leading Edge innovations and offers by joining our mailing list. Occassionally we send informative newsletters, offers and promotions that we think you'll find useful or interesting.

Your Details

Please provide your contact details so that you can receive our newsletter. We will send this occassionally with information about our latest innovations and offers.